Skip to content

Bibra Lake yard · Open 7 days · Delivery 7 days

Free 2 hour trailer use

Bibra Lake Soils

Westbuild Asphalt Pak

Out of the bag, into the hole.

Westbuild's cold-mix bitumen in UV-stabilised 20kg bags, 64 to a pallet. No heating, no mixing and no plant — it goes from the bag into the pothole. Westbuild rate it as a permanent repair because it expands and contracts with the surface around it, it can be laid in any weather, and it takes traffic immediately once properly compacted.

Or call the yard on (08) 9434 2290

Westbuild Asphalt Pak at the Bibra Lake yard
  • Westbuild Asphalt Pak — Bibra Lake yard
  • Westbuild Asphalt Pak — Bibra Lake yard

Real stock, not a swatch. Blended products vary a little batch to batch, so treat these as a guide rather than an exact colour match.

Westbuild Asphalt Pak details

Westbuild Asphalt Pak at a glance

Product type
Cold-mix bitumen
Brand
Westbuild
Pack
20kg, UV-stabilised
Pallet
64 bags
Traffic
Immediately, once compacted
Contains cement
None
Full specifications
ProductWestbuild Asphalt Pak
CategoryAsphalt pack
BrandWestbuild
TypeCold-mix bitumen
Pack20kg, UV-stabilised bag
Pallet64 bags
JointsFrom 2 to 4mm
Contains cementNo

Only figures the yard has confirmed appear here. If something you need is missing, ring us rather than assuming it matches a similar product.

What Westbuild Asphalt Pak suits

What can you use Westbuild Asphalt Pak for?

  • Potholes in driveways

    The job it exists for. A hole that would otherwise need a contractor and a hot-mix truck becomes a bag and an afternoon.

  • Road and footpath repairs

    General maintenance patching where getting a hot-mix crew out is disproportionate to the size of the damage.

  • Joints from 2 to 4mm

    Fine work as well as holes. Westbuild rate it down to 2mm joints, which is finer than a cold mix is usually good for.

  • Bad-weather repairs

    It can be laid in any weather, which is the practical advantage over anything that needs to be hot or needs to cure dry.

How many bags?

Measure the hole, then round up

Work out the hole the way you would any volume — length by width by depth — and remember that it has to be filled proud of the surface and compacted down, so the material that goes in is more than the hole appears to hold.

Bags are 20kg and there are 64 to a pallet. Buy one more than the sum says; a repair finished short sets up the next failure at the join.

RepairRoughlyWorth knowing
A small potholeOne bagMost driveway potholes are a single bag job.
Several holes on a drivewayA few bagsDo them all in one session while the compactor is out.
Pallet quantities64 bagsRing the yard and we will hold a pallet for you.

Compaction is what makes a cold-mix repair last. Follow the placing and compaction directions on the bag, and fill proud rather than flush.

Why Westbuild Asphalt Pak

Why choose Westbuild Asphalt Pak?

  • No heating, no mixing, no plant

    Open the bag and place it. That is the whole preparation, and it is the reason a repair that used to need a contractor no longer does.

  • Takes traffic immediately

    Once it is properly placed and compacted. No closing the driveway for a day and no waiting on a cure.

  • It moves with the surface

    Expanding and contracting with the original bitumen is what makes Westbuild rate it a permanent repair rather than a patch.

  • It stores

    UV-stabilised bags that keep for a long time, so a spare bag in the shed is a sensible thing to have on a bitumen driveway.

Getting Westbuild Asphalt Pak home

How to get Westbuild Asphalt Pak

Collect from the yard

Open seven days at 222 Barrington St, Bibra Lake. The loader puts it straight into your trailer or ute, and someone will tell you whether what you have brought will carry the load.

Borrow one of our trailers free for two hours to get your load home. No charge, no bond.

Have it delivered

Across Perth's southern suburbs, seven days. For a quote we need the address, how much you need, and anything awkward about access — tight driveways, low branches and side access all change which truck we send. Confirm the current cost when you order.

Formats

  • 20kg bags
  • By the pallet — 64 bags

Using Westbuild Asphalt Pak

How to use Westbuild Asphalt Pak

  1. Clean the hole out first

    Loose material, water and debris out before anything goes in. Cold mix bonds to what it is placed against, and it cannot bond to rubble.

  2. Place it in layers

    Rather than filling a deep hole in one go. Each layer compacts properly; a single deep fill compacts on top and stays loose underneath.

  3. Compact it properly — this is the step

    Compaction is what makes a cold-mix repair last. Follow the placing and compaction directions on the bag rather than treading it in and hoping.

  4. Proud, then compacted flush

    Fill slightly above the surrounding surface and compact down to level. Filling flush and then compacting leaves a dip that collects water.

When to choose something else

When it is the wrong product

  • Compaction decides whether it lasts. A cold-mix repair that was trodden in rather than compacted will fail, and that is the usual reason people conclude cold mix does not work.
  • It contains no cement, so the caustic-burn warnings on our cement and mortar bags do not apply. Bitumen products still warrant gloves and eye protection, and the safety data sheet on the bag is the authority.
  • It is a repair material, not a surfacing material. A whole driveway is a contractor's job, not sixty bags.
  • Bags are 20kg and pallets are 64 bags. Ring the yard if you want pallet quantities held for you.

Customer reviews

What people say

Westbuild Asphalt Pak questions

Westbuild Asphalt Pak FAQs

  • Do I need to heat it?

    No. It is a cold mix — no heating, no mixing and no plant. It goes from the bag into the hole.

  • How soon can I drive on it?

    Immediately, once it has been properly placed and compacted. That is the practical advantage over anything that has to cure.

  • Is it a permanent repair?

    Westbuild rate it as one, because it expands and contracts with the original surface rather than sitting in it as a rigid plug that works loose.

  • What is the most common mistake?

    Not compacting it. Compaction is what makes a cold-mix repair last, and treading it in is not compacting it — follow the directions on the bag.

  • Can I use it in the wet?

    It can be laid in any weather. Clean loose material and standing water out of the hole first regardless, so it bonds to something solid.

  • Does it contain cement?

    No, none at all. That is why it sits apart from our cement and mortar range, and why the delayed caustic-burn warnings on those bags do not apply here.

  • How many bags to a pallet?

    Sixty-four. Ring the yard if you want pallet quantities held for you.

  • Can it be delivered?

    Yes, across Perth's southern suburbs. Tell us how many bags and the address, and confirm the current delivery cost when you order.

Goes with Westbuild Asphalt Pak

Other products you may need

If the repair is concrete, not bitumen

Different material, different bag.

What goes under a driveway

The compacted base beneath the surface.

Westbuild Asphalt Pak quote

Need Westbuild Asphalt Pak for your project?

Send us the quantity you need, your suburb, and whether you would like to collect it or have it delivered. If you are not sure how much, put your measurements into the calculator above and we will check it for you.

Or ring the yard on (08) 9434 2290

222 Barrington St, Bibra Lake WA 6163 · Open 7 days

Collecting or delivering?

Use the calculator above and the amount lands in the message for you.

Quick check

Quick check

Loading icons…

In a hurry? Ring the yard on (08) 9434 2290.