Skip to content

Bibra Lake yard · Open 7 days · Delivery 7 days

Free 2 hour trailer use

Bibra Lake Soils

Bagged Concrete Perth

Add water. That is the whole job.

Two Adbri bags: General Purpose Concrete at a nominal 25MPa for work that carries something, and Rapid Set for posts. Sand, cement and aggregate are already proportioned, so you add water and place it. If you would rather batch your own, the cement page has the raw binders; if you are laying bricks rather than pouring, you want the mortar mix.

The difference between the two is the one thing worth getting right on this page. General Purpose is rated for structure. Rapid Set goes off in about fifteen minutes and is not.

Or call the yard on (08) 9434 2290

  • Open 7 days
  • Rated for load
  • Made in Western Australia
  • Free 2 hour trailer use
Concrete Bags at the Bibra Lake yard

How much concrete do you need?

Bags in, concrete out

Work out the hole or the slab first: length by width by depth, in metres, multiplied together gives you cubic metres. Then count backwards from what a bag yields.

Bagged concrete runs out of economic road fast. Anything much bigger than a few post holes or a small pad is cheaper and better as pre-mixed concrete delivered, and we will tell you where that line falls.

ProductBagWater and yield
Adbri General Purpose Concrete20kgNominal 25MPa, printed on the bag. The one for pathways, posts and slabs — anything that has to carry something.
Adbri Rapid Set20kgSets within 15 minutes. NON-STRUCTURAL on the pack: non-structural poles and posts only.

Rapid Set is non-structural — clotheslines, letterboxes, sign and fence posts. Footings, slabs and anything carrying load want the General Purpose mix. Wet concrete burns skin and the dust contains crystalline silica: gloves, eye protection and a P2 mask.

How to choose a concrete bag

Four things that actually decide it

  • Is anything carrying load?

    This is the whole decision, and it is the one people get wrong. Rapid Set is non-structural: it is for holding a post upright, not for anything bearing weight. Footings, slabs, driveways, beams and lintels want the General Purpose mix, which is rated for load.

  • How fast it has to go off

    Rapid Set reaches initial set within 15 minutes, which is what lets you plumb a post, brace it and walk away. Fifteen minutes is also not very long. Mix only what you can place, and do not loosen a stiffening batch with extra water.

  • How many bags the pour takes

    Work out your cubic metres first — length by width by depth, all in metres — because that is what tells you whether bags are sensible at all. Then divide by the yield printed on the pack. Past a certain size you are better off buying aggregate and cement, and we will tell you where that line is.

  • How you are getting it home

    Both bags are 20kg, and a pallet of them is well over a tonne. Two hours of our trailers are free, and the counter will tell you whether what you have towed should be carrying the load.

Find the right concrete

Tell us what you are pouring

Tap any job below and the range above filters itself to what suits it.

General purpose or rapid set

The one decision on this page

ProductBest forMain characteristicChoose this when
Adbri General Purpose ConcreteWork that carries somethingAdbri, 20kg, nominal 25MPaPathways, posts and slabs — anything being stood on, driven over or built up from.
Adbri Rapid SetSetting postsInitial set within 15 minutes, non-structuralA post has to be plumbed, braced and left, and nothing is bearing on it — clotheslines, letterboxes, fence and sign posts.

Concrete pickup and delivery

Collect it, or we will bring it

Collect from the yard

Open seven days at 222 Barrington St, Bibra Lake. The loader puts it straight into your trailer or ute, and someone will tell you whether what you have brought will carry the load you are asking for.

Have it delivered

Across Perth's southern suburbs, seven days. Tell us the address, how much you need and anything awkward about access — tight driveways and low branches change which truck we send. Confirm the current cost when you order.

A loader tipping a scoop into a customer's box trailer at the Bibra Lake yard

Cart your concrete home free

Borrow one of ours for two hours

Borrow one of our trailers free for two hours to get your load home. No charge, no bond.

  • Yard to your home only — no tip trips
  • Two hours, no overnight use
  • Back 30 minutes before we close, whatever the two hours says
  • Bookings not accepted, first in best dressed

Customer feedback

What people say after they have used it

Bagged concrete FAQs

What we get asked at the counter

  • What is the difference between general purpose and rapid set concrete?

    Strength and speed, and they pull in opposite directions. General Purpose Concrete Mix is rated for load-bearing work, with its strength figures printed on the bag. Rapid Set reaches initial set within 15 minutes and is non-structural.

  • Can I use rapid set concrete for a slab or a footing?

    No. Rapid Set is non-structural and is made for setting posts — clotheslines, letterboxes, sign posts, fence and pergola posts. Anything carrying load wants the General Purpose Concrete Mix instead, and that includes footings, slabs, driveways, beams and lintels — it is the most common mistake made on this page and an expensive one to undo.

  • How long do I have with rapid set concrete?

    It sets within 15 minutes, so mix only what you can place and place it without delay. If it starts to stiffen, do not try to bring it back with extra water — the maximum is printed on the bag and going past it costs you strength.

  • How many bags will I need?

    Work out the volume first: length by width by depth in metres gives you cubic metres, and the calculator on this page does it. Then divide by the yield printed on the bag. Bring the volume to the counter either way and we will work the bag count through with you, and tell you when the job has outgrown bags.

  • Do I need to add sand or cement to these bags?

    No. Both bags already contain GP cement, concreting sand and 10–12mm stone in the right proportions, so water is the only thing you add. If you would rather buy the binder and batch it yourself, the cement page has grey, creme and white general purpose cement.

  • How much water do I add?

    The quantity is printed on the bag and it is worth respecting, because extra water costs you strength in the finished pour. Measure it rather than eyeballing it from a hose.

  • Is bagged concrete dangerous to handle?

    Yes, and the burns are delayed, which is why people get caught. Wet concrete is caustic and the damage often shows up hours later — kneeling in a fresh pour in wet trousers is the classic way to do real harm without feeling a thing. Waterproof gloves, eye protection and waterproof knee pads, and a P2 mask while you tip the dry bag, because the dust contains crystalline silica.

  • Can I collect it, or do you deliver?

    Both. The yard is open seven days and every customer gets two hours of our trailers free. For pallet quantities tell us the address and where the pallet can be set down, and confirm the current delivery cost when you order.

Get a concrete quote

Tell us what you are pouring

Include your suburb if you want it delivered — it changes the price and whether the big truck can get in. If you are not sure which concrete bag you need, describe the job and we will tell you.

Or ring the yard on (08) 9434 2290

Quick check

Quick check

Loading icons…

In a hurry? Ring the yard on (08) 9434 2290.